Before butt welding, the pipe ends must be rounded and aligned. A pipe roller support will give more help in alignment and reduce the drag pressure. When the mismatch of the pipe walls is still out of local regulation, please adjust the clamping jaws by tightening down the high side until the pipe ends are even.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.