What We Check Before Shipment
For the WP1200A, the inspection mainly focuses on several key areas.
Frame and Clamping Structure
The frame is the foundation of a large-diameter butt fusion machine. During testing, we check whether the main structure is properly assembled and whether the clamps open and close smoothly.
For large HDPE pipe welding, stable clamping is especially important. A solid frame and reliable clamps help keep the pipe positioned correctly during facing, heating, joining, and cooling.
Heater and Electrical Connection
The heater is another key part of the butt fusion process. Before shipment, we check the heater connection, power interface, and related electrical parts.
For large equipment, reliable electrical connection is important, especially when the machine will later be used in a more complex construction environment.
Overall Machine Operation
Besides checking each part separately, we also observe the whole machine during operation. The frame, clamps, hydraulic unit, facer, and heater need to work together in a practical and reasonable way.
A machine should not only be able to run. It should run in a stable, clear, and easy-to-operate condition.
Real Workshop Testing Builds Confidence